Computer & Network Engineers

Call us today:
0560 0048675 or 07989 787533

Disaster Recovery

Disaster Recovery

Key Disaster Recovery services offered by SR Networks:

  • Disaster recovery plans, user training and drills
  • Setup of disaster recovery sites and/or duplicate equipment
  • Server and desktop virtualisation
  • Internet connection duplication and fall-over protection
  • Alternative power sources and battery backup protection

Business benefits of Disaster Recovery services

  • Protection from major incidents (fire, flood, theft etc)
  • Reduce recovery time from 1-2 weeks to 1-2 days
  • Reduce recovery costs by pre-planning
  • Independent of any one staff member (e.g. director on holiday)
  • Cost of recovery with a plan can be less than 5% the cost of recovery without

No matter how good your IT systems are, or how well they are supported, a major disaster can happen. A good example would be a fire – you arrive Monday morning to find your building has burned down. What do you do next? The aim of all disaster recovery plans is to restore the company first to partial functionality and then finally to full functionality. The time to get to these two stages is the metric against which disaster recovery plans are measured. All companies can get to full functionality after a disaster in 3-4weeks with little to no planning. The issue is that the business itself may not survive. The statistics show that over 70% are unlikely to survive the next 12 months.

There are two aspects to disaster recovery planning; the IT infrastructure and the written plan itself. Many IT support companies simply concentrate on the written plan, whereas we look first at the infrastructure. The reason is the written plan can certainly organise the recovery, but it can only reduce the recovery time to the minimum that their IT systems will allow. If the servers and PCs will take 6 days to setup again, then the recovery will always take 6 days no matter how the plan is executed. We first change the IT infrastructure to reduce the setup time to 2-3 days, and then write the plan based.